Lekki Phase 1 — Proof in Numbers, Proof in Night

A high‑profile 33kVA, 60kWh commercial installation demonstrates our engineering rigor and nationwide delivery capability. Below: story, specs, measured performance, and the human moments they protect.

Case Study — Lekki Phase 1
Lekki array dusk
Lekki Phase 1 — 33kVA · 60kWh · 40×620W
33kVA
Peak capacity installed
60kWh
Usable battery storage
40 × 620W
High-efficiency panels

From dark evenings to guaranteed uptime

A high-profile residence in Lekki demanded both discretion and performance. We delivered a robust 33kVA hybrid system with 60kWh of usable storage and forty 620W panels—designed to sustain essential loads through prolonged outages while blending with the architectural language of the estate.

1
Installation
33kVA inverter cluster, 60kWh Li‑ion battery bank, 40×620W bifacial panels, anti-soiling tilt, stainless rail mounting.
2
Commissioning
Full load testing, grid‑island transition verification, remote telemetry setup, and client handover with 48‑hour post‑commissioning support.
3
Maintenance
Proactive quarterly inspections, panel cleaning schedule, battery health reports and optional 24/7 SLA.

Measured performance first 90 days post‑commissioning

86%
Average uptime
42%
Grid draw reduction
₦1.2M
Estimated 12‑month energy savings
  • Average uptime: 86 percent
  • Grid draw reduction: 42 percent
  • Estimated twelve month energy savings: one million two hundred thousand Naira
"Our evenings returned immediately. The system runs silently and reliably — the team was professional from survey to handover." — Lekki Client, homeowner

Selected Projects

A curated selection showcasing the human stakes and technical consistency across homes, hospitals, factories and managed estates.

Ikeja rooftop morning
Family Home — Ikeja
Reliable evenings for a family of five
5kW · 10kWh

Ikeja — 5 kilowatt rooftop with ten kilowatt hours storage.

Clinic panels afternoon
Clinic — Port Harcourt
Clinic stays open during outages
15kW · 40kWh

Port Harcourt — clinic resilience and critical load protection.

Factory array noon
Factory — Kano
Production uptime preserved
120kW · 300kWh

Kano — factory-scale resilience reducing downtime and diesel usage.

Estate lighting dusk
Estate Lighting — Lekki II
Public lighting and security
30kW · distributed

Lekki II — shared lighting networks improving security and perception.

Hotel panels dawn
Boutique Hotel — Victoria Island
Guest comfort and lower bills
60kW · 120kWh

Victoria Island — hospitality upgrade with reliable backup and savings.

Solar pump sunset
Agricultural Pumping — Abuja
Irrigation without diesel
10kW · off-grid

Abuja — solar-powered irrigation reducing operating costs and diesel dependence.

How We Deliver — Survey, Design, Install, Maintain

A single predictable process across projects large and small. Clear milestones, transparent pricing, and a handover that includes training and remote monitoring.

Survey
On-site assessment, load audit, satellite modelling. Deliverable: site report & budget estimate.
Get a free site assessment
Design
Tailored system architecture, single‑line diagrams, procurement list, financing options.
Get a free site assessment
Install
Certified installers, safety checklist, commissioning and telemetry setup.
Get a free site assessment
Maintain
Scheduled maintenance, reporting, battery health checks, optional SLA with 24/7 support.
Get a free site assessment

Voices from the field

"Our bakery no longer loses production during load-shedding windows. The savings covered the system in under three years." — Bakery owner, Surulere

Production uptime +94% • Savings: ₦2.8M / yr

"As a property manager, I now advertise energy resilience as an amenity." — Estate manager, Lekki

Tenant satisfaction ↑ • Asset value ↑

"The maintenance reports are clear, and the team responds within SLA." — Facilities head, Abuja hospital

Critical loads maintained • 24/7 support option

Nationwide delivery — Lagos, Abuja, Port Harcourt, Kano & beyond

We stage logistics from regional hubs and deploy trained teams with pre-packed kit for fast, predictable installations across Nigeria.

Lagos — HubAbuja — HubPort Harcourt — Hub
Lagos
Hub: Lagos — staging centre; overnight team mobilization; freight consolidation.
Abuja
Hub: Abuja — technical lead; emergency response; project management.
Northern & Eastern
Hub: Kano & Port Harcourt — regional teams; local procurement assistance.

Get a personalized consultation — fast

Call us now, book a site assessment, or request a tailored quote. Engineers available for urgent consultations.

Let There Be Light, Always.

A promise kept in every installation, every service call, and every home lit through the night.

Contact our team